| A small overview about our satisfied customers: | |||||
|
customers |
working details |
used machinery |
|||
|
ARGE, CH- Biel |
AS Rugen tunnel |
Vermeer T 658 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
6,9 km |
0,45 m |
0,72 m |
3-5 und 7 +concrete und Bitum |
||
|
with combined truck loading |
|||||
|
concrete + Tiefbau, Osterwieck |
Pabstorf: wastewater and freshwater pipelines |
Vermeer T 850 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
4,2 km |
0,90 m |
1,60 m |
3-5 |
||
|
with combined pipeline drawing |
|||||
|
Betzold Rohrbau GmbH, Nürnberg |
Hainsacker: 250er ZM-TWL |
Vermeer T 655 Raupe D4c |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
3,5 km |
0,60 m |
bis 1,75 m |
3-7 |
||
|
with laser measure, topsoil work |
|||||
|
Bickhardt Bau, Thüringen |
Bei Eisenach-Kindel: ditch |
Vermeer T 850 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
1,0 km |
0,66 m |
bis 2,5 m |
3-7 |
||
|
with combined truck loading |
|||||
|
Bohlen & Doyen |
Near Mainz Laubenheim: 150er PE-gas pipeline |
Vermeer T 658 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
2,0 km |
0,35 m |
1,3 m |
3-5 |
||
|
with combined truck loading |
|||||
|
Bohlen & Doyen |
Near Abenheim-Grundheim |
Vermeer T 850 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
4,5 km |
0,66 m |
i.M. 1,8 m |
3-5 |
||
|
with combined pipeline drawing and laser measure: HDPE 315 und 400 |
|||||
|
BR Blaschette ROB, Luxembourg |
In Luxemburg: ZM steel pipeline DN 200 |
Vermeer T 850 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
12 km |
0,66 m |
1,6 m |
3-7 |
||
|
|
|||||
|
Draka, Mammendorf |
Röttingen |
Vermeer T 850 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
1,03 km |
0,66 m |
1,6 m |
3-5 |
||
|
with combined pipeline drawing: 225 er PE-AWL |
|||||
|
EGT GmbH |
Stadtroda - Ruttersdorf: cable trench |
Vermeer T 655/2 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
1,7 km |
0,35 m |
0,8 m |
3-6 |
||
|
|
|||||
|
Faber GmbH & Co. KG |
Near Durchroth |
Vermeer T 655/3 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
3 km |
0,6 m |
1,75 m |
3-7 |
||
|
with combined truck loading and pipeline drawing: 140er PE - wastewater pipeline |
|||||
|
GAWA. Bad Harzburg |
Vienenburg: 200er ZM freshwater pipeline |
Vermeer T 655/3 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
2,3 km |
0,5 m |
1,2 m |
3-5 |
||
|
with laser measure |
|||||
|
GLU GmbH |
Erfurt Airport |
Vermeer T 658 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
5,5 km 0,55 km |
0,35 m 1 m |
|
3-5 |
||
|
with combined truck loading |
|||||
|
Hausstadt & Timmermann, Heilbronn |
Möckmühl |
Vermeer T 758 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
2,5 km |
0,45 m |
1,60 m |
3-5 |
||
|
with combined pipeline drawing: gas-pipeline HDPE DA 225 |
|||||
|
Herrmann Bau GmbH, Hausen |
ICE train track near Neuwied |
Vermeer T 758 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
3 km |
0,6 m |
bis 1,75 m |
6,7 |
||
|
with laser measure |
|||||
|
Heilit + Woerner Bau AG |
A 93 motorway near Marktredwitz |
Vermeer T 850 Vermeer T 755 |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
4,5 km |
0,91 m |
bis 3,00 m |
3-5 |
||
|
with laser measure |
|||||
|
Peters GmbH |
Gronau Heyersum |
Vermeer T 655/3 PADDER Raupe D4c |
|||
|
trench length |
trench width |
trench depth |
ground classification |
||
|
11 km |
0,45 m (0,66 m) |
bis 1,1 m |
3-5, + concrete |
||
|
with combined pipeline drawing: 150er PE; padding the filling with the Padder, topsoil work |
|||||